Commonwealth Engineer's is please to provide contractors and vendors our upcoming projects that will be going to the construction phase.

The below listing encompasses those project that are out for bid as well as the the ones that are anticipated to go to bid in the next 90 days.

  • ACRWSD
    Sanitary
    Sewer
    Extension
  • Staunton
    Storm Drainage
    Improvements
    Project
  • Stilesville
    Storm Sewer
    System
    Improvements
  • Lowell
    West Side
    Sewer to New
    School Project
  • Prince's Lakes
    Sanitary
    Collection
    Improvements
  • Swayzee
    Water Works
    Improvements

  • Prince's Lake
    Sanitary
    Interceptor

Allen County Regional Water & Sewer District

We have several Sanitary Sewer Extension projects in Allen county. Please see below for a general description of each project and location.

 

  • Sanitary Sewer System Extension – Allison –Boggs Avenue – Kinnerk-Winchester Road

    The general scope of the project consists of the installation of 3,820  lineal feet of 8” gravity sanitary sewer, 1,780 lineal feet of 2" force main, 765  lineal feet of 1-1/2” force main, eight (8) grinder pump stations and complete site restoration to service existing single family homes along Alllison Avenue, Boggs Avenue, Winchester Road and Kinnerk Road.

    Ad for Bid
    Plan Holders

  • Sanitary Sewer System Extension – Cedar Canyons-Cedar Shores Addition

    The general scope of the project consists of the installation 1,770 lineal feet of 15” gravity sanitary sewer, 730 lineal feet of 12" gravity sanitary sewer, 6,970 lineal feet of 8" gravity sanitary sewer, 12,610 lineal feet of 8” force main, 2,730 liner feet of 3" force main, 2,500 linear feet of 2" force main, 760 linear feet of 1-1/2" force main, twenty-six (26) grinder pump stations and complete site restoration to service existing development througout the Cedar Canyons & Cedar Shores Additions.

    Ad for Bid
    Plan Holders

  • Sanitary Sewer System Extension – Leo Road

    The general scope of the project consists of the installation of 910 lineal feet of 8” gravity sanitary sewer, 795 lineal feet of 2” force main, three (3) grinder pump stations and complete site restoration to service existing single family homes along Leo Road.|

    Ad for Bid
    Plan Holders

  • Sanitary Sewer System Extension – Maples Road – Hughes Drive

    The general scope of the project consists of the installation of 6,420 lineal feet of 8” gravity sanitary sewer, 1,275 lineal feet of 4” force main, submersible duplex lift station and complete site restoration to provide sanitary service to existing single family homes along South Anthony Blvd., Maples Rd. and Hughes Dr.

    Ad for Bid
    Plan Holders

  • Sanitary Sewer System Extension – Plantation Park Addition

    The general scope of the project consists of the installation 4,085 lineal feet of 15” gravity sanitary sewer, 2,240 lineal feet of 8" gravity sanitary sewer, 775 lineal feet of 2” force main, six (6) grinder pump stations and complete site restoration to service existing development along Hugenard Road and within the Plantation Park Addition. 

    Ad for Bid
    Plan Holders

  • Sanitary Sewer System Extension – Winters Road

    The general scope of the project consists of the installation of 885 lineal feet of 8” gravity sanitary sewer, 430  lineal feet of 1-1/2” force main, two (2) grinder pump stations and complete site restoration to service existing single family homes along Winters Road.

    Ad for Bid
    Plan Holders




Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player




TOWN OF STAUNTON

STORM DRAINAGE IMPROVEMENTS PROJECT


The Project will be constructed in one (1) contract division and is defined and outlined as
follows:


The general scope of this project consists of the installation of 12-inch to 30-inch
diameter storm sewers within the rights-of-way of Franklin Street, Columbus
Street, Pleasant Street, Monroe Street, and Indiana Street within the Town of
Staunton (Clay County). The project will also include associated manholes,
inlets, earthwork,

 

Ad for Bid

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Plan Holders

Town of Stilesville

Storm Sewer System Improvements


The Project will be constructed in one (1) contract division and is defined and outlined as follows:

The general scope of this project consists of the installation of 12-inch, 15-inch, 21-inch, 24-inch and 30-inch storm sewers within the right-of-way of Clinton Street, Morgan Street, North Street, South Street, Tudor Road and Wayne Street within the Town of Stilesville.  The project will also include associated manholes, inlets, earthwork and pavement replacement.   

 

Ad For Bid

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Plan Holders for Div. A

Bid Tab

 

 

 

Town of Lowell

West Side Sewer to New School Project

The Project will be constructed in one (1) contract division and is defined and outlined as follows:

Construct a new sanitary sewer from the Lowell Wastewater Treatment Plant to the new Tri-Creek Middle School.



Ad for Bid

Plan Holders

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


Apparent Low

PRINCE'S LAKES
SANITARY COLLECTION AND TREATMENT SYSTEM IMPROVEMENTS PROJECTS

Division A – Wastewater Treatment Plant Improvements Project

This division shall include improvements to the wastewater treatment plant including a new bar screen and headworks building, improvements to the grit removal facilities, a new oxidation ditch, new secondary clarifiers, new ultra violet disinfection, converting existing secondary clarifiers to sludge holding tanks, new polymer feed and sludge dewatering facilities, lab building improvements, sludge removal from existing sludge lagoons, and all other ancillary electrical, piping, and equipment improvements required for a complete and operational treatment plant.

Division B – Sanitary Interceptor Manhole Rehabilitation Project

This division shall include rehabilitation of approximately 40 existing sanitary interceptor manholes and all other required work and material to complete the improvements.

Division C – Interceptor Improvements Project

This division shall include improvements to the existing sanitary interceptor including cured-in-place pipe lining and all other required work and material to complete the improvements.

Division D - Sanitary Interceptor Manhole Rehabilitation Project

This division shall include rehabilitation of approximately 96 existing sanitary manholes and all other required work and material to complete the improvements.

Division E – Sanitary Interceptor Improvements Project

This division shall include improvements to the existing sanitary sewers including cured-in-place pipe lining, pipe bursting and all other required work and material to complete the improvements.

Project shall include rehabilitation of approximately 5900 feet of 24”, 2600 foot of 18”, 3500 feet of 15”, 4,400 feet of 12”, 3700 feet of 10” and 6600 feet of 8”.

Division F – Sanitary Collection Improvements Project

This project shall include improvements to the existing sanitary collection system.  Improvements shall generally include the construction of 8” and 18” new sanitary sewers with approximate length of 8,700 feet.  The construction of new sanitary sewers includes new gravity sewer, new force main, one (1) grinder pump station, and a new septage receiving station.

 

**Please note that 'Div C - interceptor Improvements' has been delayed. This phase of work will be moved into January bidding along with the additional sewer rehabilitation work of approximately 20,00 feet of 8 thru 24 inch as outlined above in Div D, E, and F.



Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Ad For Bid

Second Ad For Bid

Plan Holders

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Awards for Div A & B

Awards For Div C, D, E, F


Swayzee
Water Works Improvements

Division "A" - Plant and Distribution System Improvements

This Contract Division includes, but is not limited to, the furnishing and installation of a new induced draft aluminum aerator at the Town’s existing water treatment plant, a new insertion type electromagnetic flow meter on the existing raw water supply line, and the removal and disposal of the plant’s existing aerator.  The project also includes the repair of exterior concrete surfaces of the existing plant detention basin, three insertion valve installations within the existing water distribution system, surface restorations, and related work.

Division "B" - New Elevated Water Storage Tank

This Contract Division includes, but is not limited to, the fabrication and erection of a new steel elevated water storage tank of the multiple column design with a nominal capacity of 200,000 gallons.  The work consists of the fabrication and construction of all tank related items, including elevated steel tank, concrete foundations, interior and exterior tank coating systems, and all associated sitework, piping, valves, fittings, connections to existing piping, electrical service requirements, and the dismantling and disposal of the Town’s existing 60,000 gallon elevated water storage tank.

 

Ad For Bid

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Plan Holders Div A

Plan Holders Div B

Apparent Low

TOWN OF PRINCE'S LAKES
SANITARY INTERCEPTOR PROJECT


The Project will consist of one (1) contract division and is defined and outlined as follows:

The Project will consist of cleaning and internal inspection of approximately 3,000 feet of 24” and 11,500 feet of 30” gravity sewer

 

 